bored pile造句
1、large diameter bored pile
2、The application of post-injecting method in bored pile engineering
3、On application of bored pile in complicated geological conditions
4、Application of the self-balance test pile method in the bored pile loading performance test
5、The bored pile has obtained wide use in highway building, in the construction of bridge bored pile, broken pile quality accident easily happened.
6、How to select concrete pump for bored pile construction is discussed in terms of pump structure, performance and requirements of bored pile construction on pump.
7、The bored pile by churning drive and bored pile with slurry wall protection are widely adopted in loess foundation in recent years.
8、And the influence of slime present beneath a bored pile base on load-transfer function for pile base is considered.
9、Analysis on factors of having influences on the pile quality and loading capacity of the bored pile
10、The construction features of bored pile foundation of bridge are introduced and significant parameter in pile construction quality control.
11、The paper introduces the application of the bored pile with two scooted heads in the manual excavated pile.
12、Experimental study on vertical bearing capacity of post cast bored pile in Shanghai region
13、The prevention and treatment of bored pile construction and underwater concrete pouring accidents
14、Application study of in pile by base post grouting super-long and lame-diameter bored piles
15、In this paper, the bridge's pier column of double columns bored pile makes internal force calculation.
16、The results indicate that the bored pile works well and has high potential carrying capacity.
17、Based on the He-Da highway construction of bored pile analysis is made on the preventions of broken pile from five aspects.
18、The standard penetration test(SPT)of base-pile of the artificial bored pile is very essential according to the feature of this project.
19、This paper presents the construction process of pile base grouting for bored pile foundations of Paksey Bridge, in which the selected materials, equipment and construction technology are covered.
20、This paper introduces the construction method of deepwater pile foundation including the putting up of drilling platform and the construction of bored pile.
21、In this article, the author talked about views on quality management of large Bridges bored pile construction.
22、Construction technology and quality control of large diameter super-deep bored pile under complex geological condition are introduced.
23、Through analyzing the engineering cases, this paper briefly describes two different construction measures of bearing bored pile.
24、Technology and mechanism of compaction grouting used in bored pile base grouting to enhance the bearing capacity are discussed.
25、The tests show that the longer the age of bored piles, the higher the opening pressure of pile end post grouting. However, the age of bored piles has little influence on the final grouting pressure.
26、Based on Suqian Construction Building which locates in high intensity earthquake area, the paper presents the consolidation technology for bored pile.
27、This paper discusses the common quality problems and preventive measures during the construction of cast-in-situ bored pile construction in detail.
28、Relevant fundamental principle and main results of bored pile integrity testing by dynamic test method such as shock, vibration, etc. will also be dealt with in this paper.
29、The bearing capacity of super-long and large-diameter bored pile tip is influenced by the facts including construction process, depth effect, size effect and so on.
30、Systematic field tests on pile groups with near prototype size have been carried out in order to research into the behavior and bearing capacity of bored pile groups in silt.
31、Ultra-long bored pile is only used as friction pile because of the present construction technology, and the end bearing capacity cannot play the role effectively because of the fallen grit and mud.
32、The design of bored pile foundation is researched in calculations of floodgate structure. At the same time, the thesis discusses how to consider carrying capacity of vertical resistance between piles.
33、The bored pile is a common foundation type, which transfers the loads to the deep layer of soil or rock in order to mitigate the uneven sink of structures.
34、The construction technique in question is applicable to the river reach where water current directions and water levels are varying and to the construction of bored piles and elevated pile caps for deep water foundations of major bridges over river and sea in the offshore area.
35、On construction treatment measures of bored piles in volcanic lavas
36、Discussion on the construction points and problems treating of bridge underwater cast-in-place bored piles
37、On the construction scheme and craft of the reinforced concrete bored piles
38、Intension and extension of bored piles part in budgetary rating of new bridges and culverts;
-
甘爽造句
1、菜品特点:金黄似珠,皮酥馅腴,味清鲜甘爽。2、一茶友寻得邹炳良老先生亲传的小罐手工普洱熟茶,兴高采烈取来让我冲泡,一享其酽纯甘爽。3、全身心贯注在茶上,一口一口慢慢品茗,不要在意茶味的甘苦,你的心越清净,喝出来的茶越清香甘爽。...
-
附比造句
1、实验结果表明:微波脱附比热脱附脱附速度更快,效率更高;2、测定了9个裂变产物的吸附比。3、这层的吸附比同等重量的活*炭杂质更为独特的属*,也草*已知不被吸附的碳离子。4、结果表明,固定床反应器的酶吸附比釜式多,而酶的活*变化在两种型式反应器中比较接近。5、植...
-
元丰三年造句
1、苏轼是在元丰三年1080年。2、公元1080年宋神宗元丰三年二月。3、刘温,神宗元丰三年一○八○。4、之句;至此年(元丰三年)四月时,已著成《易传》九卷、《论语说》五卷,并把后者抄寄文彦博文彦博见苏轼《黄州上文潞公书》,《苏轼文集》卷四*。...
-
斗批改造句
1、省直单位到扶沟县搞“斗批改”,父亲也去了。2、1969年,省直单位到扶沟县搞“斗批改”,父亲也去了。3、斗批改的时候,我们被押解到舒城的舒茶公社,我们是一起走着去的4、到底,浩然是在斗批改和下放农村中度过的,完全放下了笔5、六年制的学业被“斗批改”“接受再...