文语站

位置:首页 > 造句 > 

embankment fill造句

造句3.39W

1、Soil compacting construction of stone embankment fill in high fill slope stage

embankment fill造句

2、For example, it can apply to embankment reinforcement and embankment fill and rock slope defence and pavement crack prevention etc.

3、The stress reduction ratio and the vertical stress distribution in the embankment fill were studied in detail.

4、Author go over the number of papers about engineering behavior of embankment fill, summarize and analysis the mechanism of compacted soil.

5、The soft soil base stability must make reasonable evaluation when the embankment fill construction on the ground base of the soft soil.

6、Test verification of Baise expansive soils used as embankment fillings

7、Choosing embankment filling with large friction Angle is helpful to increasing pile efficacy.

8、High-speed railway embankment filling technology and quality control experiment research

9、Then base on equal time-interval GM (1,1) model, and take the variation of embankment load into consideration, a modified GM (1,1) model is put forward for embankment filled with uniform ground soil.

10、CFRD observation system plays important roles for guidance of embankment filling construction and safety operation of dam after reservoir filling.

11、Flyash can be used as the embankment filling and its engineering property is closely related to the water content.

标签:造句 fill