文语站

位置:首页 > 造句 > 

maritime works造句

造句1.57W

The box girder concrete casting key point, layout of equipment and casting time control are analyzed on the base of construction performance of high quality maritime works concrete.

maritime works造句

Corrosion of reinforcement is one of the main causes of damage of reinforced concrete of maritime works, and protective cover is an important mean for deferring corrosion of reinforcement.

标签:maritime 造句