文语站

位置:首页 > 造句 > 

reference datum造句

造句2.27W

The chink section of relative rest must be taken as the reference datum of shearing leakance direction.

reference datum造句

Some key techniques, such as attitude correction, quality control of GPS height, transformation of vertical reference datum and extraction of tidal level, are studied in detail.