文语站

位置:首页 > 造句 > 

WIP造句

造句1.86W

I have seen some zealous WIP operators who purged successful editions from the WIP.

WIP造句

我曾看到一些热心的WIP*作员将成功的版本从WIP中清除。

For each edition maintained in the WIP, its most current status is displayed.

Some of the KPIs are Performance to Schedule, Inventory turns, WIP days on hand, Resource Utilization, Scrap, Returns, etc.

If WIP in the store is too few, the downstream process has to wait for items not ready when needed, but at the same time WIP should be minimized to prevent overproduction.

1 Parts / WIP are well managed and handled within working area, without causing potential drop or unnecessary cosmetic defects.

A WIP of 1 was set for this lane, since we want to discourage the use of this category.

The WIP contains, for the last execution of each step, the intermediate statuses that the step went !

The WIP window is a very dynamic environment; information about editions very frequently changes in the WIP, to reflect when the transformation steps are scheduled, and how the execution progresses.

The maximum number of Kanbans (the "energy" in the system) is fixed and physically conserves the upper limit of WIP at any given time.

They make it a "pull" system, creating a balance between sustaining "continuous flow" (eliminating the waste of waiting) and "minizing WIP" (eliminating the waste of overproduction).

The amount of information stored in the WIP can grow quite significantly, especially if the amount of steps run daily is large.

WIP包含了每个步骤最后一次执行中所经历的中间状态。 错!

"Limits WIP", "Continuous Flow" and "Pull" properties are not attained by the Agile Kanban example by itself, shown in Figure 5.

WIP窗口是一个极其动态的环境;版本的有关信息在WIP中频繁变化,用以反映何时调度转换步骤以及执行进度如何。

The WIP administrator will be responsible to define an appropriate schedule for executing the process with the steps that move the data into the WIP_ARCHIVE_COPY table and populate the target tables.

WIP中存储的信息量可能会极快地增长,特别是在每天运行很多步骤的情况下。

In this approach, the focus is on "Limits WIP", "Continuous Flow" and "Pull", at the same time, allowing the team (or manager) to use it for process improvement purposes.

所谓的WIP和LEP法,之前主要是根据欧盟物流能力评定标准等资料整合和发展形成的比较标准*的概念*的框架*方法。

标签:造句 WIP