文语站

位置:首页 > 造句 > 

hopper dredger造句

造句1.08W

Based on the sequential quadratic programming method, a thrust allocation for the trailing suction hopper dredger was presented.

hopper dredger造句

The paper intends to prove that the intact stability of a hopper dredger in part load condition is better than that in full load condition.

Improving the working character and the efficiency of trailing suction hopper dredgers will greatly increase the production, save power and bring more interests for dredging industry.

标签:造句 dredger hopper