文语站

位置:首页 > 造句 > 

CITC造句

造句3.04W

1、Design of Employee performance Management System for CITC Corporation;

CITC造句

2、The Design and Discuss of Water Supply, Drainage and Fire Control Engineering for the Electrical Education Center of CITC;

3、If the Bids are submitted by a special Courier, the special Courier number must be informed in written fax to CITC at lease 4 days before the Bid Opening.

标签:造句 CITC