文语站

位置:首页 > 造句 > 

absorption tower造句

造句1.87W

Analysis and improvement for absorption tower liquid level measurement in wet FGD system

absorption tower造句

The air drying and final absorption towers are installed in series as an integral and share a circulation acid tank and pump with intermediate absorption tower.

The exit temperature buffer protected the valves and ensured the normal operation of absorption tower as well.

The experimental circumstances of the title research in a pilot plant scale are presented, and the performing conditions of the absorption tower have been studied.

DL tray can reduce the heat load of the first absorption tower and reduce the addition amount of reflux ammonia. As a result, ammonia treatment capacity is increased.